Sand filling system for Egyptian Subway
  • Project Name: Sand Filling System
  • Client: Colas Rail
  • Project Completion Date: July 25, 2022

Sand filling system for Egyptian Subway

Design and fabricate of sand filling ( Screw Conveyor ) system for Colas Rail , Egypt new subway line

Project Overview

We been selected for  design and fabricating of a sand filling system to be used in construction works inside subway tunnels,

System Covered by mechanical / electrical design and execution

Service Milestone

  • Design screw conveyor with specific capacity of 5 m3/h
  • Screw rotating based on fabricated pivot plain bearing and supported by steel rollers
  • System been automated for operation control and interlocks, all controlled by a hand remote control
  • System power sourced by diesel generator , in which its control embedded with the hand remote

Reliable & Experience

System commissioned and tested ,  amazing benefits resulted as

  • Direct cost reduction ,  by reducing manually filling manpower cost
  • Automation and monitoring for sand consumption
  •  Created a plannability and time control for important project milestone

 

 

 

 

# Project Commissioned for Favor of Colas Rail Egypt